Follow
Eziaku Onyeizu Rasheed
Title
Cited by
Cited by
Year
Sustainable refurbishment for school buildings: a literature review
ATH Le, KS Park, N Domingo, E Rasheed, N Mithraratne
International Journal of Building Pathology and Adaptation 39 (1), 5-19, 2021
522021
The productivity paradox in green buildings
H Byrd, EO Rasheed
Sustainability 8 (4), 347, 2016
452016
Total quality management practices in large construction companies: A case of Oman
A Bakar, KB Ali, E Onyeizu
World Applied Sciences Journal 15 (2), 285-296, 2011
402011
Can self-evaluation measure the effect of IEQ on productivity? A review of literature
EO Rasheed, H Byrd
Facilities 35 (11/12), 601-621, 2017
392017
Does the number of occupants in an office influence individual perceptions of comfort and productivity?—new evidence from 5000 office workers
EO Rasheed, M Khoshbakht, G Baird
Buildings 9 (3), 73, 2019
382019
The utilisation of inustrialised building system in design innovation in construction industry
EN Onyeizu, A Hassan, A Bakar
Applied Sciences 15 (2), 205-213, 2011
292011
The influence of work group size and space sharing on the perceived productivity, overall comfort and health of occupants in commercial and academic buildings
M Khoshbakht, G Baird, EO Rasheed
Indoor and Built Environment 30 (5), 692-710, 2021
272021
Time spent in the office and workers’ productivity, comfort and health: A perception study
EO Rasheed, M Khoshbakht, G Baird
Building and Environment 195, 107747, 2021
262021
Why are naturally ventilated office spaces not popular in New Zealand?
EO Rasheed, H Byrd, B Money, J Mbachu, T Egbelakin
Sustainability 9 (6), 902, 2017
222017
Building maintenance cost planning and estimating: A literature review
ATH Le, N Domingo, E Rasheed, KS Park
Proceedings of the 34th Annual ARCOM Conference, ARCOM, 697-706, 2018
212018
Influence of key role players on productivity outcomes in the residential building lifecycle
J Mbachu, T Egbelakin, EO Rasheed, WM Shahzad
Journal of Engineering, Design and Technology 15 (4), 528-551, 2017
202017
EVALUATING RISK MANAGEMENT PRACTICES IN CONSTRUCTION INDUSTRY: EVIDENCE FROM OMAN.
AHB Abu Bakar, K Ali, EN Onyeizu, MN Yusof
International Journal of Academic Research 4 (2), 2012
202012
Can a naturally ventilated office outperform a mixed mode office? Pilot study on occupants' comfort
EO Rasheed, H Byrd
Building and Environment 137, 34-40, 2018
162018
Office distractions and the productivity of building users: The effect of workgroup sizes and demographic characteristics
M Khoshbakht, EO Rasheed, G Baird
Buildings 11 (2), 55, 2021
132021
The delusion of green certification: The case of New Zealand green office buildings
E Onyeizu
Proceedings of the 4th New Zealand Built Environment Research Symposium …, 2014
112014
Strategic collaboration in managing existing buildings in New Zealand's state schools: school managers' perspectives
ATH Le, N Domingo, E Rasheed, K Park
Construction management and economics 40 (3), 173-185, 2022
102022
Modelling of underlying social psychological effects on occupant energy-related behaviours
AS Weerasinghe, JOB Rotimi, EO Rasheed
Building and Environment 231, 110055, 2023
92023
Maturity model of building maintenance management for New Zealand’s state schools
ATH Le, N Domingo, E Rasheed, K Park
Building Research & Information 50 (4), 438-451, 2022
92022
Can architecture increase productivity? The case of green certified buildings
E Onyeizu
PhD Thesis-University of Auckland, 2014
92014
ASSESSING KEY FACTORS IN DESIGN IN THE INDUSTRIALISED BUILDING SYSTEM (IBS) APPROACH: STAKEHOLDERS'OPINIONS IN MALAYSIA.
EN Onyeizu, AHA Bakar
International Journal of Academic Research 3 (4), 2011
82011
The system can't perform the operation now. Try again later.
Articles 1–20