Follow
Lucas Hogan
Title
Cited by
Cited by
Year
Lessons learnt from 2011 Christchurch earthquakes: Analysis and assessment of bridges
A Palermo, L Wotherspoon, J Wood, H Chapman, A Scott, L Hogan, ...
Bulletin of the New Zealand Society for Earthquake Engineering 44 (4), 319-333, 2011
442011
Preliminary findings on performance of bridges in the 2010 Darfield earthquake
A Palermo, M Le Heux, M Bruneau, M Anagnostopoulou, L Wotherspoon, ...
Bulletin of the New Zealand Society for Earthquake Engineering 43 (4), 412-420, 2010
352010
Geotechnical aspects of the mw 6.2 2011 Christchurch, New Zealand, earthquake
RA Green, M Cubrinovski, B Bradley, D Henderson, P Kailey, K Robinson, ...
GeoCongress 2012: State of the Art and Practice in Geotechnical Engineering …, 2012
212012
Research programme on seismic performance of reinforced concrete walls: Key recommendations
A Shegay, F Dashti, L Hogan, Y Lu, A Niroomandi, P Seifi, T Zhang, ...
Bulletin of the New Zealand Society for Earthquake Engineering 53 (2), 54-69, 2020
182020
Full-scale experimental pushover testing of an existing URM building
LS Hogan, I Giongo, KQ Walsh, JM Ingham, D Dizhur
Structures 15, 66-81, 2018
162018
Dynamic field testing of a three-span precast-concrete bridge
LS Hogan, L Wotherspoon, S Beskhyroun, J Ingham
Journal of Bridge Engineering 21 (12), 06016007, 2016
162016
Seismic performance of concrete bridges during Canterbury earthquakes
A Palermo, L Wotherspoon, L Hogan, M Le Heux, E Camnasio
Structural Concrete 13 (1), 14-26, 2012
152012
Development and validation of retrofit techniques for hollow-core floors
F Bueker, N Brooke, KJ Elwood, DK Bull, L Hogan, M Parr
The 2021 Structural Engineering Society New Zealand Conference, Hamilton …, 2021
122021
Development of long span bamboo trusses
L Hogan, GC Archer
5th International CSAAR Sustainable Architecture and Urban Development …, 2009
122009
ReCast Floors-Seismic assessment and improvement of existing precast concrete floors
NJ Brooke, KJ Elwood, DK Bui, A Liu, RS Henry, T Sullivan, LS Hogan, ...
SESOC Journal 32 (1), 50-59, 2019
112019
Aspects affecting the nonlinear behavior of precast prestressed hollow‐core units failing in shear
AI Sarkis, F Büker, TJ Sullivan, KJ Elwood, E Brunesi, LS Hogan
Structural Concrete 23 (5), 3021-3038, 2022
92022
In-plane behaviour of composite floor slab diaphragm interfaces under high shear demand
H Rezaeian, GC Clifton, GA MacRae, L Hogan, JBP Lim
Journal of Constructional Steel Research 162, 105715, 2019
82019
Assessment of the historic seismic performance of the New Zealand highway bridge stock
SW Lew, L Wotherspoon, L Hogan, M Al-Ani, P Chigullapally, ...
Structure and Infrastructure Engineering 17 (5), 689-701, 2021
72021
Development and testing of retrofit solutions for hollow-core floors in existing buildings
M Parr, K Elwood, D Bull, F Bueker, L Hogan, A Puranam, R Henry, ...
Concrete New Zealand Conference 2019, 2019
72019
Modal identification of a bridge-abutment system using forced vibration testing
LS Hogan, LM Wotherspoon, S Beskhyroun, JM Ingham
Bulletin of the New Zealand Society for Earthquake Engineering 45 (4), 161-170, 2012
72012
Vibration testing of an in situ bridge pier to determine soil-structure interaction effects
LS Hogan, LM Wotherspoon, S Beskhyroun, JM Ingham
15th World Conference of Earthquake Engineering, 2012
72012
Overview of retrofit requirements and techniques for precast concrete floors
NJ Brooke, F Buker, DK Bull, KJ Elwood, RS Henry, L Hogan
SESOC Journal 35 (1), 30-54, 2022
62022
Seismic damage observations of precast hollow-core floors from two full-scale super-assembly tests
F Buker, M Parr, G De Francesco, LS Hogan, DK Bull, KJ Elwood, A Liu, ...
SESOC Journal 35 (1), 125-147, 2022
62022
Simplified mechanics-based approach for the seismic assessment of corroded reinforced concrete structures
S Nataraj, L Hogan, A Scott, J Ingham
Journal of Structural Engineering 148 (3), 04021296, 2022
62022
Performance of panel-to-foundation connections in low-rise precast concrete buildings
LS Hogan, RS Henry, JM Ingham
SESOC Journal 31 (1), 26-36, 2018
62018
The system can't perform the operation now. Try again later.
Articles 1–20