Follow
Yu-Ting Kao
Title
Cited by
Cited by
Year
Impact of integrating equipment health in production scheduling for semiconductor fabrication
YT Kao, S Dauzère-Pérès, J Blue, SC Chang
Computers & Industrial Engineering 120, 450-459, 2018
262018
Opportunity for improving fab effectiveness by predictive overall equipment effectiveness (POEE)
Y Kao, S Chang, S Dauzere-Peres, J Blue
2016 e-Manufacturing and Design Collaboration Symposium (eMDC), 1-4, 2016
102016
Near optimal furnace tool allocation with batching and waiting time constraints
YT Kao, SC Zhan, SC Chang, JH Ho, P Wang, PB Luh, S Wang, F Wang, ...
2011 IEEE International Conference on Automation Science and Engineering …, 2011
92011
Setting daily production targets with novel approximation of target tracking operations for semiconductor manufacturing
YT Kao, SC Chang
Journal of manufacturing systems 49, 107-120, 2018
82018
Optimal wet-furnace machine allocation for daily fab production
S Wang, F Wang, J Chang, JY Chang, SC Chang, P Wang, PB Luh, ...
2010 International Symposium on Semiconductor Manufacturing (ISSM), 1-4, 2010
52010
Target setting with consideration of target-induced operation variability for performance improvement of semiconductor fabrication
YT Kao, SC Chang, CM Chang
2014 IEEE International Conference on Automation Science and Engineering …, 2014
32014
Bottleneck-centric pull and push allocation and sequencing of wet-bench and furnace tools
YT Kao, SC Zhan, SC Chang
2013 e-Manufacturing & Design Collaboration Symposium (eMDC), 1-4, 2013
22013
Efficient and waiting time violation-free furnace tool allocation via integration of sequencing constraints
YT Kao, SC Zhan, SC Chang
2012 e-Manufacturing & Design Collaboration Symposium (eMDC), 1-2, 2012
2012
Effective WIP flow estimation for daily fab production target setting with consideration of variability
YT Kao, SC Chang, PB Luh, S Wang, H Chuang, J Chang
2010 International Symposium on Semiconductor Manufacturing (ISSM), 1-4, 2010
2010
Priority Cycle Time Behavior Modeling for Semiconductor Fabs
SC Chang, BJ Liao, YT Kao, A Chen
2009 First International Conference on Advances in System Simulation, 38-43, 2009
2009
The system can't perform the operation now. Try again later.
Articles 1–10