Monitoring systems and their effectiveness for project cost control in construction SH Al-Jibouri International journal of project management 21 (2), 145-154, 2003 | 237 | 2003 |
Genetic algorithms for construction site layout in project planning MJ Mawdesley, SH Al-Jibouri, H Yang Journal of construction engineering and management 128 (5), 418-426, 2002 | 219 | 2002 |
Lean transformation in a modular building company: A case for implementation H Yu, M Al-Hussein, S Al-Jibouri, A Telyas Journal of management in engineering 29 (1), 103-111, 2013 | 197 | 2013 |
Identifying key performance indicators for use in control of pre‐project stage process in construction T Haponava, S Al‐Jibouri International Journal of Productivity and Performance Management 58 (2), 160-173, 2009 | 109 | 2009 |
Proposed system for measuring project performance using process-based key performance indicators T Haponava, S Al-Jibouri Journal of management in engineering 28 (2), 140-149, 2012 | 108 | 2012 |
Automated post-simulation visualization of modular building production assembly line SH Han, M Al-Hussein, S Al-Jibouri, H Yu Automation in construction 21, 229-236, 2012 | 108 | 2012 |
Ergonomic analysis and the need for its integration for planning and assessing construction tasks N Inyang, M Al-Hussein, M El-Rich, S Al-Jibouri Journal of Construction Engineering and Management 138 (12), 1370-1376, 2012 | 92 | 2012 |
Modelling construction project productivity using systems dynamics approach MJ Mawdesley, S Al‐Jibouri International Journal of Productivity and Performance Management 59 (1), 18-36, 2009 | 89 | 2009 |
Capturing and integrating knowledge for managing risks in tunnel works IC Cárdenas, SSH Al‐jibouri, JIM Halman, FA van Tol Risk Analysis: An International Journal 33 (1), 92-108, 2013 | 75 | 2013 |
BIM approach for automated drafting and design for modular construction manufacturing A Alwisy, M Al-Hussein, SH Al-Jibouri Computing in civil engineering (2012), 221-228, 2012 | 66 | 2012 |
The enhancement of simulation based learning exercises through formalised reflection, focus groups and group presentation M Mawdesley, G Long, S Al-Jibouri, D Scott Computers & Education 56 (1), 44-52, 2011 | 66 | 2011 |
Proposed genetic algorithms for construction site layout MJ Mawdesley, SH Al-Jibouri Engineering Applications of Artificial Intelligence 16 (5-6), 501-509, 2003 | 63 | 2003 |
Proposed methodology for risk analysis of interdependent critical infrastructures to extreme weather events M Tsavdaroglou, SHS Al-Jibouri, T Bles, JIM Halman International journal of critical infrastructure protection 21, 57-71, 2018 | 55 | 2018 |
Planning linear construction projects: automated method for the generation of earthwork activities WH Askew, SH Al-Jibouri, MJ Mawdesley, DE Patterson Automation in construction 11 (6), 643-653, 2002 | 53 | 2002 |
Effects of resource management regimes on project schedule S Al-jibouri International Journal of Project Management 20 (4), 271-277, 2002 | 53 | 2002 |
Post simulation visualization model for effective scheduling of modular building construction M Moghadam, M Al-Hussein, S Al-Jibouri, A Telyas Canadian journal of civil engineering 39 (9), 1053-1061, 2012 | 51 | 2012 |
Modeling risk‐related knowledge in tunneling projects IC Cárdenas, SSH Al‐Jibouri, JIM Halman, FA Van Tol Risk analysis 34 (2), 323-339, 2014 | 47 | 2014 |
Influence of process performance during the construction stage on achieving end‐project goals T Haponava, S Al‐Jibouri Construction Management and Economics 28 (8), 853-869, 2010 | 46 | 2010 |
Efficacy of estimation methods in forecasting building projects’ costs S Bayram, S Al-Jibouri Journal of construction engineering and management 142 (11), 05016012, 2016 | 45 | 2016 |
Design and experience with a computer game for teaching construction project planning and control SH Al‐Jibouri, MJ Mawdesley Engineering, Construction and Architectural Management 8 (5/6), 418-427, 2001 | 34 | 2001 |