A Digital Twin predictive maintenance framework of air handling units based on automatic fault detection and diagnostics HH Hosamo, PR Svennevig, K Svidt, D Han, HK Nielsen Energy and Buildings 261, 111988, 2022 | 188 | 2022 |
Automated reconstruction of parametric bim for bridge based on terrestrial laser scanning data G Qin, Y Zhou, K Hu, D Han, C Ying Advances in Civil Engineering 2021 (1), 8899323, 2021 | 43 | 2021 |
Experimental study on corrosion-fretting fatigue behavior of bridge cable wires Z Liu, T Guo, D Han, A Li Journal of Bridge Engineering 25 (12), 04020104, 2020 | 43 | 2020 |
Seismic design of self-centering viscous-hysteretic devices used for steel moment-resisting frames R Zhu, T Guo, F Mwangilwa, D Han Engineering Structures 239, 112369, 2021 | 23 | 2021 |
Mechanical state inversion method for structural performance evaluation of existing suspension bridges using 3D laser scanning Y Zhou, Z Xiang, X Zhang, Y Wang, D Han, C Ying Computer‐Aided Civil and Infrastructure Engineering 37 (5), 650-665, 2022 | 20 | 2022 |
Integrating BIM and IoT for smart bridge management Z Zhao, Y Gao, X Hu, Y Zhou, L Zhao, G Qin, J Guo, Y Liu, C Yu, D Han IOP Conference Series: Earth and Environmental Science 371 (2), 022034, 2019 | 20 | 2019 |
Accurate virtual trial assembly method of prefabricated steel components using terrestrial laser scanning Y Zhou, D Han, K Hu, G Qin, Z Xiang, C Ying, L Zhao, X Hu Advances in Civil Engineering 2021 (1), 9916859, 2021 | 19 | 2021 |
A comprehensive review and analysis of nanosensors for structural health monitoring in bridge maintenance: innovations, challenges, and future perspectives D Han, H Hosamo, C Ying, R Nie Applied Sciences 13 (20), 11149, 2023 | 17 | 2023 |
A Bayesian-driven Monte Carlo approach for managing construction schedule risks of infrastructures under uncertainty L Chen, Q Lu, D Han Expert Systems with Applications 212, 118810, 2023 | 16 | 2023 |
The use of the BIM-model and scanning in quality assurance of bridge constructions CN Rolfsen, AK Lassen, D Han, H Hosamo, C Ying ECPPM 2021-eWork and eBusiness in Architecture, Engineering and Construction …, 2021 | 13 | 2021 |
Semi‐automated Generation of Geometric Digital Twin for Bridge Based on Terrestrial Laser Scanning Data K Hu, D Han, G Qin, Y Zhou, L Chen, C Ying, T Guo, Y Liu Advances in Civil Engineering 2023 (1), 6192001, 2023 | 11 | 2023 |
Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction C Ying, Y Zhou, D Han, G Qin, K Hu, J Guo, T Guo IOP Conference Series: Earth and Environmental Science 371 (2), 022036, 2019 | 10 | 2019 |
A memory-attention hierarchical model for driving-behavior recognition and motion prediction H Yin, J Wang, J Lin, D Han, C Ying, Q Meng International journal of automotive technology 22 (4), 895-908, 2021 | 8 | 2021 |
Efficient recycling and reuse of waste concrete on a construction site D Han, Y Yang, C Ying, Z Sierens, H Fan, J Li ACI Mater. J 326, 38.1-38.10, 2018 | 8 | 2018 |
Experimental and theoretical investigation of the crack behavior of RC-slabs subjected to biaxial bending D Han München, Univ. der Bundeswehr, Diss., 2011, 2014 | 6 | 2014 |
Anwendung des TLS zur Untersuchung des Last-Verformungsverhaltens von Flächentragwerken aus Stahlbeton D Han, O Heunecke, M Keuser, W Liebl, I Neumann, K Nichelmann Ingenieurvermessung 10, 57-65, 2010 | 6 | 2010 |
大跨度桥梁桥面线形测量新方法 徐进军, 廖骅, 韩达光, 邢诚 测绘通报, 91, 2016 | 4 | 2016 |
Research on BIM and virtual pre-assembly technology in construction management D Han, CN Rolfsen, BD Engeland, H Hosamo, H Hjelmbrekke, K Hu, ... ECPPM 2021-eWork and eBusiness in Architecture, Engineering and Construction …, 2021 | 3 | 2021 |
基于三维激光扫描技术的高边坡变形监测分析 司梦元, 周银, 郭杰明, 袁亚通, 白祖应, 王义成, 应春莉, 韩达光 科学技术与工程 20 (19), 7922-7927, 2020 | 3 | 2020 |
New methods for deflection measurement of bridge with large span X Jinjun, L Hua, H Daguang, X Cheng Bulletin of Surveying and Mapping, 91, 2016 | 3 | 2016 |